Ready to go — but what does Palma's second ring road really mean for Coll d'en Rabassa?
Fan Mallorca shopping centre connectivity with Palma’s ring road
Describes how the ring road project seeks better access to the FAN Mallorca shopping centre.

Answer
How will the FAN Mallorca shopping centre area be affected?
More questions on this topic
Related follow-up questions from the same article, collected in one place.
What is Palma’s second ring road, and how could it affect traffic around Coll d'en Rabassa?
A two-phase Ma-30 link intended to relieve long-distance traffic and boost local connections around Coll d'en Rabassa.
When is Palma's second ring road expected to start, and how long will construction take?
End of 2026 start; a bit over five years total in two phases.
What are the main concerns residents have about the construction phase?
Construction could bring noise, dust, detours, and business disruption; residents want clear schedules and protections.
Will there be public oversight and transparent planning for the project?
Yes, with open calendars, meetings, and independent monitoring.
How will cycling and pedestrian access be protected during construction?
Plans include continuous cycling connections and temporary routes.
Will public transport options be expanded to reduce car trips?
Public transport improvements are part of the plan.
What is the Ma-30 tunnel under Coll d'en Rabassa, and what does it mean for traffic?
A central feature of Phase 2, a one-kilometre tunnel to carry Ma-30.
Similar notes
Discover more interesting content